Before you begin
What this tool needs
Use the exact kWp from the quote, not the panel count alone.
Enter your supplier’s export payment and import rate because their spread drives payback.
Reading the answer
What your result means
Payback combines avoided imports and paid exports. It is not a guarantee of future tariff values.
A battery can increase self-consumption while also increasing capital cost enough to lengthen payback.
Boundaries
Assumptions and limitations
Working assumptions
- Grant: €700/kWp for the first 2 kWp and €200/kWp for the next 2 kWp, capped at €1,800.
- Generation uses 900 kWh/kWp/year before orientation adjustment.
- When no quote is entered, cost is estimated as €2,500 plus €1,100/kWp, and €3,000 more for a 5 kWh battery.
Where to be careful
- A professional yield estimate should model roof pitch, horizon, shading and local losses.
- Approval must be in place before work begins and an SEAI-registered company must be used.
Common questions
Questions about this tool
How much is the domestic solar grant in 2026?
SEAI states €700 per kWp up to 2 kWp, then €200 per additional kWp up to 4 kWp, with a maximum of €1,800.
Does adding a battery increase the solar grant?
No standalone battery amount is added to this domestic solar-PV grant calculation.