Electric vehicles
EV charger grant
Check the €300 SEAI home-charger grant, including the charger-arm route open to homes with no off-street parking, and compare home, public and petrol costs on your own mileage.
Verdanyx category · Ireland
Check SEAI support properly: the bundle a heat-pump grant really is, the second wall grant allowed since March 2026, and the charger route open to a home with no off-street parking.
4 tools in this areaElectric vehicles
Check the €300 SEAI home-charger grant, including the charger-arm route open to homes with no off-street parking, and compare home, public and petrol costs on your own mileage.
2026 grant
Check the SEAI heat-pump grant as the bundle it actually is: unit, central-heating work and Renewable Heat Bonus, each with its own conditions and its own apartment maximum.
2026 grant
Work out the fixed SEAI attic, cavity, internal and external wall grants for your own dwelling type, including the enhanced rates and the second wall grant allowed since March 2026.
2026 grant
Check SEAI solar grant eligibility and get generation, bill value and simple payback for your own roof, on yields checked against the European Commission's PVGIS data for ten Irish towns.
Before you decide
A grant checker can separate an apparently suitable project from one that clearly misses a scheme rule, but it cannot issue approval. Eligibility, the maximum support available and the amount finally paid are different things. Property type, ownership, previous grants, technical standards and the route used to complete the work can all matter.
Run the relevant checker early, before accepting a quote or allowing work to begin. Scheme rules, grant values and application routes change, which is why each checker states the date it was last reviewed and the cadence it is reviewed on, and why the result is worth reading alongside the linked SEAI material rather than instead of it.
Do not assume an eligible measure can be installed first and claimed later. Follow the official sequence shown for the scheme and retain the application and approval records.
The published maximum may be limited by eligible costs, property details, technical findings or the measures actually completed. Budget for the full project rather than treating the headline figure as guaranteed cash.
Registered contractors, product standards, BER evidence and post-works documentation may be part of the scheme. A competitive quote is useful only if it follows the qualifying route.