Skip to content

Verdanyx category · Ireland

Irish grant checkers

Check SEAI support properly: the bundle a heat-pump grant really is, the second wall grant allowed since March 2026, and the charger route open to a home with no off-street parking.

4 tools in this area
01Grants

Electric vehicles

EV charger grant

Check the €300 SEAI home-charger grant, including the charger-arm route open to homes with no off-street parking, and compare home, public and petrol costs on your own mileage.

No account requiredUse tool
02Grants

2026 grant

Heat pump grant

Check the SEAI heat-pump grant as the bundle it actually is: unit, central-heating work and Renewable Heat Bonus, each with its own conditions and its own apartment maximum.

No account requiredUse tool
03Grants

2026 grant

Insulation grants

Work out the fixed SEAI attic, cavity, internal and external wall grants for your own dwelling type, including the enhanced rates and the second wall grant allowed since March 2026.

No account requiredUse tool
04Grants

2026 grant

Solar grant

Check SEAI solar grant eligibility and get generation, bill value and simple payback for your own roof, on yields checked against the European Commission's PVGIS data for ten Irish towns.

No account requiredUse tool

Before you decide

Use grant checks before committing to work

A grant checker can separate an apparently suitable project from one that clearly misses a scheme rule, but it cannot issue approval. Eligibility, the maximum support available and the amount finally paid are different things. Property type, ownership, previous grants, technical standards and the route used to complete the work can all matter.

Run the relevant checker early, before accepting a quote or allowing work to begin. Scheme rules, grant values and application routes change, which is why each checker states the date it was last reviewed and the cadence it is reviewed on, and why the result is worth reading alongside the linked SEAI material rather than instead of it.

Approval normally comes before installation

Do not assume an eligible measure can be installed first and claimed later. Follow the official sequence shown for the scheme and retain the application and approval records.

Headline grant and final payment differ

The published maximum may be limited by eligible costs, property details, technical findings or the measures actually completed. Budget for the full project rather than treating the headline figure as guaranteed cash.

Contractor and technical rules matter

Registered contractors, product standards, BER evidence and post-works documentation may be part of the scheme. A competitive quote is useful only if it follows the qualifying route.